Construction Update #2

Construction Update #2

Construction Update (final week of April) stadium pic 43018stadium 43018stadium pic 2 43018stadium pic 3 43018 For a good part of April, the field was too mushy to get the concrete trucks across. On the location of the retaining wall: The field is designed to be 215’...
Tipp Pride 8/1 Press Conference

Tipp Pride 8/1 Press Conference

Tipp City, Ohio – August 2, 2017 – The Tipp Pride Association (TPA) along with nearly a hundred students and faculty enthusiastically welcome residents to a public press conference at City Park Tuesday afternoon at City Park. Vice-President of TPA Scott George...